• Structural analysis of changes introduced, ongoing design support for the production of cars, their parts and component assemblies,
  • Analysis and possible completion of drawings of construction documentation in CAD systems for the needs of the FCA Tychy Plant,
  • Cooperation with the technical services of the manufacturer for new launches of systems, models and versions of vehicles,
  • Cooperation with the manufacturer's services to improve the quality of component assemblies and complete vehicles, participation in project teams,
  • Analysis of proposed changes to the design documentation, and if justified, preparation of changes in the form of revised technical drawings,
  • Clarification of the drawing requirements, standardisation and technical specifications, as well as the interpretation of the requirements resulting from the applicable construction documentation,
  • Construction works resulting from the immediate needs of the production process,
  • Diagnosing production and construction problems, together with developing proposals for solving them,
  • Cooperation with suppliers in the area of problems arising from their technical documentation and production process,
  • Participation in meetings with suppliers as part of the Supplier Audit,
  • Participation in meetings with FCA suppliers in Tychy,
  • Analysis and preparation of presentations for explaining the causes of identified defects,
  • Technical analysis of damaged parts removed from FCA vehicles, which were returned to TNT from the FCA dealer network,
  • E/E works as part of diagnoses and analyzes on production lines in companies producing motor vehicles both in Poland and abroad,
  • Work on the development of concepts and documentation for electric vehicles,
  • Making designs, prototypes, parts and subassemblies for electric vehicles,
  • Realisation and conversion of electric vehicles.